Grace Point Fellowship Church

Franklin, OH

EnviroControl Systems was contacted to do a design build on an existing structure.  This ongoing project is being completed in phases. Phase One, 2018:  RTU added with ductwork.  Phase Two, 2019: three RTUs added with new ductwork.  Phase Three, 2020: Project in Value-Engineering, Design-Build phase. EnviroControl Systems demonstrated team spirit, working with adjoining business to provide crane lift location before business hours for project’s RTUs.